Generates project-plan.md with phases, milestones, technical approach, and parallelizable work units. Use when moving from research/context into implementation planning.

build-plan

Take the project context and research synthesis (if available) and produce a comprehensive project plan. The plan decomposes the project into phases, milestones, and individual work units tagged for parallel or sequential execution.

When to use

  • Research is complete (or skipped) and the user is ready to plan the build.
  • User says "build plan", "project plan", "plan the build", "plan it out."
  • project-context.md exists and the user wants to move to implementation.

Inputs

InputSourceRequired
project-context.mdProject rootYes
/artifacts/research/research_synthesis.mdresearch-execute outputNo (plan from context alone if absent)
plan-template.mdBundled in templates/ beside this skillYes

Instructions

  1. Read all inputs. Start with project-context.md — it defines what to build, for whom, and under what constraints. Then read research_synthesis.md if it exists — it provides evidence for tech choices and flags risks. If research was not run, note it and proceed from context alone. The plan will be less evidence-backed but still functional.

  2. Competitive landscape check. Load /gemini for invocation syntax. Key params: 120s timeout, prompt: "For a project described as: [one-line summary from context]. List the top 5 competing or similar projects/products. For each: name, what it does, strengths, weaknesses, and what this project could learn from it. Bullet points only.". Output to /tmp/competitive-landscape.md. Read the output and incorporate relevant insights into the plan (especially "lessons learned" and "differentiation"). If Gemini is unavailable or fails, retry with Copilot — load /copilot for invocation syntax. Same prompt, same output file. If both fail, skip and note it.

  3. Technical feasibility check. Load /codex for invocation syntax. Key params: --sandbox read-only, --ephemeral, --cd /tmp, 120s timeout. Prompt: "Given this tech stack: [stack from context]. And this scope: [scope summary]. Flag any technical risks: library maturity issues, known scaling problems, integration pain points, or missing pieces. Be specific.". Output to /tmp/feasibility-check.txt. Read the output and factor risks into the plan. If Codex is unavailable, skip and note it.

  4. Define phases. Break the project into 3-6 phases. Each phase should deliver something usable or testable — avoid phases that are purely preparatory with no visible output. Typical phase pattern:

    • Phase 1: Foundation — Core data model, project setup, basic API or skeleton.
    • Phase 2: Core features — The primary value proposition. What makes this project worth existing.
    • Phase 3: Integration — Connect to external systems, auth, real data.
    • Phase 4: Polish — UI refinement, error handling, edge cases, performance.
    • Phase 5: Ship — Deployment, monitoring, documentation, launch.

    Adapt this pattern to the specific project. Some projects need a research spike as Phase 1. Others can skip integration. Match the phases to the actual work.

  5. Set milestones. Each phase gets 1-2 milestones. A milestone is a concrete, testable statement: "User can log in and see their dashboard" not "Auth is done." Milestones are the checkpoints that tell the user (and future agents) whether the project is on track.

  6. Decompose into work units. Within each phase, break the work into discrete units sized for AI worker execution. Each work unit includes:

    FieldDescription
    IDWU-<phase>-<seq> (e.g., WU-1-03)
    TitleShort descriptive name
    DescriptionWhat this unit delivers (1-3 sentences)
    DependenciesList of WU IDs that must complete first
    Parallelizableyes or no — can this run alongside other units?
    LOC estimateTarget 50-200 LOC across 2-5 files. Units >200 LOC must be split. (SWE-bench data: success drops from 74% to 11% on multi-commit features.)
    Key filesFiles this unit creates or modifies. Two parallel units must NOT modify the same file.
    Acceptance criteriaVerifiable criteria — each unit must produce at least one testable export. Write criteria as pass/fail checks, not vague descriptions.

    Sizing rule: If a unit can't be described in 1-3 sentences with clear acceptance criteria, it's too big. Split it. If it touches >5 files, it's too broad. Narrow it.

    No-placeholders rule (MANDATORY): Every work unit must be fully implementable as specified. Reject any work unit that:

    • Uses "wire up later", "placeholder for now", "TBD", or "to be determined"
    • Defers integration to a future unit without naming that unit by ID
    • Describes an output without specifying who consumes it
    • Creates exports, config keys, or env vars without stating where they're read
    • Acquires resources (DB, PTY, WebSocket) without specifying cleanup

    If a unit can't be fully wired in isolation, split it differently or merge it with the consuming unit. The goal: every unit's output is connected to a consumer by the end of the same wave.

    Tag work units as parallelizable when they have no mutual file dependencies. This enables multi-agent execution via meta-execute — workers run in parallel on isolated worktrees.

  7. Map dependencies. Draw the dependency graph (as a text-based DAG or table). Identify the critical path — the longest chain of sequential work units. This determines the minimum project duration regardless of parallelism.

  8. Identify risks. Pull from research synthesis, feasibility check, and your own analysis. For each risk:

    • What could go wrong.
    • Likelihood (high/medium/low).
    • Impact (high/medium/low).
    • Mitigation strategy.
  9. Define the technical approach. For each major component (auth, data layer, API, UI, etc.), describe the approach in 3-5 sentences. Reference research findings where applicable. This is not full architecture docs — it is enough for an agent to start implementing without guessing at the overall strategy.

  10. Write the plan. Use templates/plan-template.md as the skeleton. Save to project-plan.md in the project root. Structure:

    # Project Plan — {{PROJECT_NAME}}
    
    Generated: {{date}}
    Based on: project-context.md, research_synthesis.md
    
    ## Executive Summary
    [3-5 sentences: what, how many phases, key risks, estimated total effort]
    
    ## Phases and Milestones
    [Phase table with milestones and target dates if timeline is known]
    
    ## Technical Approach
    [Per-component approach descriptions]
    
    ## Work Units
    [Full table of all work units with all fields]
    
    ## Dependency Graph
    [Text DAG or table showing unit dependencies and critical path]
    
    ## Risks
    [Risk table with likelihood, impact, mitigation]
    
    ## Competitive Insights
    [Key takeaways from landscape analysis, if available]
    
    ## Open Items
    [Anything unresolved that needs user input before work begins]
    
  11. Integration wiring audit. Before presenting the plan, verify:

    • Every work unit that creates an export names the consuming unit(s) by ID.
    • Every env var or config key introduced by a unit is consumed within the same wave or explicitly carried forward as a dependency.
    • Every resource opened by a unit (DB, PTY, event bus, WebSocket) has cleanup specified in that unit's acceptance criteria.
    • No work unit uses "placeholder", "TBD", "wire later", or deferred language. If any violations are found, fix them before presenting. This prevents the "code exists but isn't connected" failure mode that plagues multi-agent builds.
  12. Present for approval. Show the user the plan summary (phases, milestone count, total work units, critical path length, top risks). Ask if priorities are correct, if anything is missing, and if effort estimates feel right. The user knows their domain better than any model — their calibration matters.

  13. Revise if needed. If the user requests changes, update the plan and re-present. Re-run the integration wiring audit (step 11) after revisions. Do not write the final file until approved.

Exit condition

project-plan.md exists in the project root. All phases have milestones. All work units have dependencies mapped and parallelism tagged. Risks are identified. The user has approved the plan.

Optional: Skeleton Generation (Codex)

After the user approves the plan, offer to generate skeleton files:

"Plan approved. Want me to generate skeleton files (interfaces, types, module stubs) for the work units? This gives implementation a head start."

If yes:

  1. Load /codex for invocation syntax. If Codex is unavailable, skip.
  2. If available, for each work unit that creates new files, dispatch a Codex worker. Key params: --sandbox workspace-write, --ephemeral, --cd <project-root>, 180s timeout. Prompt: "Generate skeleton files for this work unit. Create the file structure with interfaces, type definitions, function signatures (with TODO bodies), and module exports. Do NOT implement business logic — just the structure. Work unit: [DESCRIPTION] Tech stack: [FROM PROJECT CONTEXT] Files to create: [FROM PLAN]".
  3. If Codex is unavailable, skip — this is a convenience step, not required.

Examples

User: "Plan the build"
Action: Read project-context.md and research_synthesis.md. Run competitive
        landscape (Gemini) and feasibility check (Codex) in parallel.
        Define phases, milestones, work units. Write project-plan.md.
        Present summary for approval.
User: "Create a project plan — we didn't do research"
Action: Note that research was skipped. Read project-context.md only. Skip
        research-dependent sections. Flag areas where research would have
        helped (add them as risks). Proceed with planning.
User: "Build plan, but keep it to 3 phases — this is a small project"
Action: Condense to 3 phases. Reduce work unit granularity — combine small
        related units. Keep milestones and dependencies. Respect the user's
        calibration on scope.
User: "We need to re-plan — scope changed after phase 1"
Action: Read existing project-plan.md and project-context.md. Ask what
        changed. Rewrite phases 2+ while preserving completed phase 1.
        Update dependencies and re-assess risks.

Cross-cutting

Before completing, read and follow ../references/cross-cutting-rules.md.