Post-Plan Workflow — Materialize and Implement
Plan approval is the green light for the full pipeline. Proceed through all three phases without stopping.
Phase 1: Materialize
Complete materialization before any implementation begins.
- Create MCP items from the approved plan using
create_work_tree(preferred for structured work with dependencies) ormanage_items(for individual items). Apply appropriate schema tags based on the plan and the project's.taskorchestrator/config.yaml— this activates gate enforcement for each item. If the config defines separate schemas for containers vs. child tasks, apply the appropriate tag at each level. - Wire dependency edges between items — use
BLOCKSfor sequencing,fan-out/fan-inpatterns for parallel work - Check
expectedNotesin create responses — if the item's tags match a schema, the response includes the expected note keys and phases. Fill required queue-phase notes (requirements,acceptance-criteria, etc.) with content from the plan before advancing. - Verify all item UUIDs exist — confirm the full item graph is materialized before proceeding
If create_work_tree fails: Check partial state with query_items(operation='overview'). Delete partial items with manage_items(delete, recursive=true) and retry.
Do NOT dispatch implementation agents until materialization is complete. Agents need MCP item UUIDs to self-report progress.
Phase 2: Implement
Dispatch subagents to execute the plan:
- Each subagent owns one MCP item — include the item UUID in the delegation prompt
- If
expectedNotesentries includeguidance, embed it in the delegation prompt as authoring instructions when filling notes - If
expectedNotesentries include askillfield, include in the delegation prompt: "Before filling the<key>note, invoke/<skill>and follow its framework." This ensures subagents receive deterministic skill routing rather than relying on guidance prose - Agents own phase entry only — each agent calls
advance_item(trigger="start")once to enter work phase, fills work-phase notes, and returns. The orchestrator handles all further transitions (work→review or work→terminal depending on schema). Agents do NOT calladvance_itema second time - Fill work-phase notes (
implementation-notes,test-results, etc.) as the agent works - Respect dependency ordering — do not dispatch an agent for a blocked item until its blockers complete
- Between waves: call
get_blocked_items(parentId=...)to confirm upstream items completed — dependency gating implicitly verifies agents transitioned their items. If downstream items are still blocked, investigate the upstream blocker - Do not call
advance_itemorcomplete_treefor terminal transitions on items delegated to agents — the orchestrator reviews and advances to terminal after agents return
Do NOT use AskUserQuestion between phases — proceed autonomously.
Phase 3: Verify
After all agents complete:
- Run
query_items(parentId=..., role="work")— any results are items agents failed to transition. Use/status-progressionto diagnose and manually advance stuck items - Run
get_context()health check to see what completed, what stalled, and what needs attention - Review any stalled items — check which notes are missing with
get_context(itemId=...) - Address blockers or incomplete work as needed
Workflow Complete
The post-plan workflow is done. Report the final status to the user — what completed, what needs attention, and any items still in progress.