batch-process
Process multiple content pieces in parallel with queue management, priority scheduling, and progress tracking
Batch Content Processing
Process multiple content requirements simultaneously through the ContentForge pipeline with intelligent queue management, priority-based scheduling, and real-time progress tracking.
When to Use
Use /batch-process when:
- You have 2+ content pieces to produce
- You want to maximize throughput with parallel execution
- You need priority scheduling (urgent pieces first)
- You want real-time progress visibility
- You're running agency-scale production (10-50+ pieces)
What This Command Does
- Intake Multiple Requirements — Read from Google Sheets or CSV with multiple rows
- Build Execution Queue — Create prioritized queue with estimated completion times
- Parallel Orchestration — Launch multiple ContentForge pipelines simultaneously (max 5 concurrent)
- Progress Tracking — Real-time dashboard showing status of each piece (phase completion, quality scores, ETA)
- Error Handling — Automatic retry for transient failures, human escalation for persistent issues
- Completion Report — Summary of all pieces (successes, failures, quality scores, total time)
Required Inputs
Google Sheets (Recommended):
- Sheet with columns:
Requirement ID,Content Type,Title/Topic,Target Audience,Brand,Word Count Target,Priority(1-5),Status - Each row = one content piece
- Example sheet: ContentForge Batch Template
CSV (Alternative):
requirement_id,content_type,title,target_audience,brand,word_count,priority,status
REQ-001,article,AI in Healthcare 2026,Healthcare CIOs,AcmeMed,2000,1,pending
REQ-002,blog,10 Tips for Remote Teams,HR Managers,TechCorp,1500,3,pending
How to Use
Basic Usage
/batch-process
Prompt: "Which Google Sheet contains your content requirements?"
With Direct Sheet URL
/batch-process https://docs.google.com/spreadsheets/d/ABC123/edit
With CSV Upload
/batch-process batch-requirements.csv
What Happens
Step 1: Queue Building (1-2 minutes)
- Load all requirements from source
- Validate each row (required fields, brand exists, content type supported)
- Calculate estimated time per piece based on content type and word count
- Sort by priority (1=highest, 5=lowest)
- Display queue summary: Total pieces, estimated total time, concurrent execution plan
Step 2: Parallel Execution (20-30 min per piece, up to 5 concurrent)
- Launch up to 5 ContentForge pipelines simultaneously
- Each pipeline runs full 10-phase process independently
- Progress tracker updates in real-time
- When one completes, next in queue starts automatically
Step 3: Progress Dashboard (Live Updates)
╔═════════════════════════════════════════════════════════════════╗
║ ContentForge Batch Processing Dashboard ║
║ Total: 12 pieces | Running: 5 | Completed: 4 | Failed: 0 ║
║ Estimated Completion: 45 minutes ║
╠═════════════════════════════════════════════════════════════════╣
║ REQ-001 | AI in Healthcare | Phase 7 ✓ | Score: 9.2 | 2min ║
║ REQ-002 | Remote Teams Blog | Phase 4 → | Est: 18min ║
║ REQ-003 | SEO Whitepaper | Phase 2 → | Est: 42min ║
║ REQ-004 | FAQ Product Launch | Completed ✓ | Score: 8.8 ║
║ REQ-005 | Case Study Acme | Phase 6.5→ | Est: 8min ║
╚═════════════════════════════════════════════════════════════════╝
Step 4: Completion Report
- Total pieces processed: X
- Successful completions: Y (Z%)
- Human review required: N pieces (scores <5.0)
- Average quality score: 8.7/10
- Total processing time: HH:MM
- Output locations: [Google Drive folder link]
Priority Scheduling
Priority Levels:
- 1 (Urgent): Processed first, deadline-driven (e.g., press release for tomorrow)
- 2 (High): Campaign-critical content
- 3 (Normal): Standard blog posts, articles
- 4 (Low): Evergreen content, no deadline
- 5 (Backlog): Nice-to-have, filler content
Concurrency Limits
- Max 5 concurrent pipelines (prevents resource exhaustion, API rate limits)
- Each pipeline is fully independent (no shared state)
- If piece fails, it's retried once; if fails again, marked for human review
Error Handling
Transient Failures (Auto-Retry)
- API rate limits → wait 60s, retry
- Network timeouts → retry immediately
- Source URL temporarily unavailable → retry with alternate sources
Persistent Failures (Human Escalation)
- Brand profile not found
- Requirement validation fails (missing required fields)
- Quality score <3.0 after max loops (2 attempts)
- Two consecutive pipeline failures
Requirements
MCP Integrations
- ✅ Google Sheets — Requirement intake
- ✅ Google Drive — Output storage
Brand Profiles
- All brands referenced in requirements must have existing profiles
- Use
/brand-setupto create missing brands before batch processing
Output Structure
All outputs organized in Google Drive:
ContentForge Output/
└── Batch_2026-02-17_14-30/
├── REQ-001_AI-in-Healthcare_v1.0.docx
├── REQ-002_Remote-Teams-Blog_v1.0.docx
├── REQ-003_SEO-Whitepaper_v1.0.docx
├── batch-summary-report.txt
└── failed-requirements.csv (if any)
Performance Metrics
Typical Batch Run (12 pieces):
- Sequential (v1.0): ~240-360 minutes (4-6 hours)
- Parallel (v2.0): ~60-90 minutes (1-1.5 hours)
- Speedup: 4-5x faster
Troubleshooting
"Queue is empty"
- Check Google Sheet has rows with
status=pending - Ensure Sheet URL is correct and accessible
"Max concurrency reached"
- Wait for one pipeline to complete
- Current limit is 5 concurrent (can't be increased)
"Brand profile not found"
- Run
/brand-setup [brand-name]for missing brands - Update requirements sheet with correct brand names
"Multiple pieces stuck in Phase X"
- Likely API rate limit across all pipelines
- System will auto-throttle and continue
- Check API quotas (web_search, Drive API)
Example Workflow
Scenario: Agency needs 15 blog posts for 3 clients by end of week
-
Prepare Requirements Sheet
- 15 rows in Google Sheet
- Columns: ID, type=blog, title, audience, brand, word_count=1200, priority=2
-
Run Batch Processing
/batch-process https://docs.google.com/spreadsheets/d/ABC123/edit -
Monitor Progress
- Dashboard shows 5 running, 0 completed
- Estimated completion: 90 minutes
-
Review Outputs
- 14/15 completed successfully (scores 8.5-9.5)
- 1/15 requires human review (score 4.8, citation issues)
-
Quality Check
- Spot-check 3 random pieces
- Fix the one flagged for review
-
Deliver to Clients
- All 15 pieces delivered in 2 hours vs. 6 hours sequential
Integration with Other Skills
- Before Batch:
/brand-setupfor new brands - During Batch: Progress tracker auto-updates
- After Batch: Use outputs directly or run
/content-refreshfor updates
Limitations (v2.0)
- Max 5 concurrent pipelines (more can overwhelm APIs)
- All pieces must use existing brand profiles (no on-the-fly creation)
- Google Sheets or CSV only (no Notion, Airtable yet — coming in v2.1)
Agent Used
- Batch Orchestrator Agent (new in v2.0) — see
agents/09-batch-orchestrator.md
Related Skills
/brand-setup— Create brand profiles/content-refresh— Update existing content/generate-variants— A/B test variations
Version: 3.4.0 Agent: Batch Orchestrator Utilities: batch-queue-manager.md, progress-tracker.md