generate-risk-register
Generates a risk register from project charter (initial mode) or enriches it with project plan data (detailed mode). Two modes: initial — phase 1 after charter approval; detailed — phase 2 after project plan approval. Triggers RU: «сформируй реестр рисков», «подготовь risk register», «обнови реестр рисков», «создай реестр рисков». Triggers EN: 'generate risk register', 'create risk register', 'update risk register'.
generate-risk-register
Triggers
Russian: «сформируй реестр рисков», «подготовь risk register», «обнови реестр рисков» English: "generate risk register", "create risk register", "update risk register"
Language Detection
Determine the language of the user's request:
- If the request is in Russian → use templates with
-rusuffix - Otherwise → use templates with
-ensuffix
All output (headings, labels, comments, instructions) must match the detected language.
1. Input Data
Initial mode (phase 1)
| Data | Required | Source | Notes |
|---|---|---|---|
| Project charter (project-charter.md) | yes | knowledge | Primary context: goal, scope, timeline, budget, constraints, assumptions |
| Project type / industry | no | chat or knowledge | Used to select industry-typical risks. If not specified — agent infers from charter |
| Additional context | no | chat | User comments on specific risks |
Detailed mode (phase 2)
| Data | Required | Source | Notes |
|---|---|---|---|
| Project charter (project-charter.md) | yes | knowledge | Project context |
| Project plan (project-plan.md) | yes | knowledge | WBS, timeline, resources, dependencies — source of new risks |
| Risk register v1 (risk-register.md) | yes | knowledge | Output of initial mode — base for update |
| Additional context | no | chat | New risks identified by the user |
If required data is missing — request using this template:
To generate the risk register, the following is required:
— Initial mode: approved project charter (project-charter.md).
— Detailed mode: charter + project plan (project-plan.md) + current risk register (risk-register.md).
Available data: [list what is available].
Missing: [be specific].
2. Execution Algorithm
-
Determine mode. If the user has not specified — infer from context: project plan present → detailed, charter only → initial. If ambiguous — ask.
-
Verify input data. Minimum data for the selected mode is present → step 3. Missing → request using the template from §1. Do NOT generate a placeholder or sample register.
-
Read the template
risk-register-ru.mdorrisk-register-en.mdfrom project knowledge (based on detected language). -
Identify risks.
- Initial: Analyze the charter from scratch — goal, scope (included and excluded), timeline, budget, constraints, assumptions, team composition. For each charter section evaluate: what could go wrong? Use categories from the reference table (§3). Recommended count: 5–10 risks. Do not automatically copy the top-3 risks from the charter — perform an independent analysis (charter risks may enter the register if confirmed by analysis).
- Detailed: Use register v1 as the base. Analyze the project plan: WBS (which work packages are highest risk?), critical path, dependencies, resource constraints. Add new risks. Update assessments of existing risks (probability/impact may have changed). For each risk — link to WP-xxx from the plan, assign a specific owner from project-plan. Specify actions concretely.
-
Assess each risk using the scale from the reference table (§3): category, probability (H/M/L), impact (H/M/L), level, strategy (Avoid/Mitigate/Transfer/Accept). Level is calculated strictly by the table below — not by intuition or proximity to adjacent cells:
Probability Impact Level H H Critical H M High M H High H L Medium M M Medium L H Medium M L Low L M Low L L Low Common error: H×M and M×H are High, not Medium. Verify every risk against this table before recording in the register.
-
Fill the register table following the rules in §3.
-
Fill the risk matrix. For each risk, perform 3 steps:
- (a) Read from the table: probability → this is the ROW of the matrix; impact → this is the COLUMN of the matrix.
- (b) Find the cell at the intersection of that row and column → write the ID.
- (c) Verify: matrix row = probability from the table? matrix column = impact from the table? If not — correct.
Common error: for risks with L (low) probability, the ID is incorrectly placed in the "Medium" row instead of "Low". Verify each L-probability risk separately.
-
Validate the result using the checklist (§5).
-
Present the result in chat. Format:
- What was done: "Risk register generated (mode: initial/detailed) based on [list sources]."
- Number of risks: N (including critical: M).
- Assumptions (if any).
- Action required: "Approve, provide comments, or reject."
- Do not include system file paths.
- [register content]
-
Wait for user response.
- Approval → produce final text.
- Comments → revise, show updated version. After 3rd iteration — ask: "Continue revising or finalize current version?"
-
After approval — complete both steps:
- Provide the user with text to insert into log.md and project-state.md.
- Propose the specific next skill. This is a mandatory part of the response — without it the skill chain breaks. Use these exact phrases:
- Initial: "Risk register approved. Next task: generate-project-plan (project plan). Start?"
- Detailed: "Risk register updated. Next task: generate-comm-plan (communication plan). Start?"
3. Filling Rules
Header metadata
Version: 1.0 (initial) or 2.0 (detailed when updating v1).Date: current generation date (YYYY-MM-DD).File:risk-register.md.Document status:draft(at generation). After user approval —approved.Mode:initialordetailed.Source: list source files (e.g., "project-charter.md" or "project-charter.md, project-plan.md, risk-register.md v1").
Register table
The table contains exactly 10 columns (no more, no less): ID, Risk, Category, Probability, Impact, Level, Strategy, Actions, Owner, Status. Adding extra columns is prohibited — it breaks compatibility with the template and other skills. The difference between modes is in the depth of content:
| Column | Initial | Detailed |
|---|---|---|
| ID | R001, R002, ... | Retain IDs from v1 for existing risks. New risks — next sequential number |
| Risk | Wording: "Event → consequence for the project" | Same, refine wording if needed |
| Category | From reference table (see below) | Same |
| Probability | H/M/L | Reassess using plan data |
| Impact | H/M/L | Reassess using plan data |
| Level | Per matrix (see below) | Recalculate |
| Strategy | From reference table (see below) | Refine if needed |
| Actions | Brief, 1–2 sentences | Specific steps linked to WP-xxx from the plan |
| Owner | PM (default) or "assign during planning" | Specific team member from project-plan |
| Status | open | open / in progress / closed / triggered |
Category reference table
| Category | Description | Examples |
|---|---|---|
| Technical | Technologies, architecture, integrations | System incompatibility, architecture errors |
| Resource | People, competencies, availability | Loss of key specialist, skill gaps |
| External | Factors outside team control | Regulatory changes, competitor actions |
| Organizational | Processes, communication, decision-making | Approval delays, priority conflicts |
| Financial | Budget, pricing, ROI | Budget overrun, contractor rate changes |
Assessment scale
| Rating | Probability | Impact |
|---|---|---|
| H (High) | >60% — likely to occur | Critical: schedule slip >2 weeks, budget >20%, scope substantially changes |
| M (Medium) | 30–60% — may occur | Significant: schedule 1–2 weeks, budget 10–20%, scope partially affected |
| L (Low) | <30% — unlikely | Minor: schedule <1 week, budget <10%, scope unaffected |
Risk level matrix (probability × impact)
| L (impact) | M (impact) | H (impact) | |
|---|---|---|---|
| H (prob.) | Medium | High | Critical |
| M (prob.) | Low | Medium | High |
| L (prob.) | Low | Low | Medium |
Strategy reference table
| Strategy | When to apply | Example action |
|---|---|---|
| Avoid | The risk cause can be eliminated | Reject a risky technology |
| Mitigate | Probability or impact can be reduced | Prototyping, schedule buffer |
| Transfer | Consequences can be shifted to another party | Insurance, outsourcing, fixed-price contract |
| Accept | Response cost > damage, or risk is outside team control | Monitor without active steps, budget reserve |
Risk matrix (visualization)
Place risk IDs in the matrix cells from the template. Each risk goes into one cell corresponding to its probability and impact assessment.
4. Placeholder Table
Placeholders
{{}}in the template are fill-in guides, not auto-substitution variables. Replace each with the corresponding value from the input data.
| Placeholder | Required | Source | Allowed values |
|---|---|---|---|
{{project_name}} | yes | project charter | text |
{{version}} | yes | agent | 1.0 (initial), 2.0 (detailed when updating v1) |
{{date}} | yes | system | YYYY-MM-DD |
{{mode}} | yes | agent / user | initial or detailed |
{{source_docs}} | yes | agent | list of source files |
{{risk_description}} | yes (≥5 for initial, ≥ count in v1 for detailed) | agent | wording: "event → consequence" |
{{category}} | yes | agent | one of the 5 categories from the reference table |
{{level}} | yes | agent | Critical / High / Medium / Low (per matrix) |
{{strategy}} | yes | agent | Avoid / Mitigate / Transfer / Accept |
{{actions}} | yes | agent | text, 1–2 sentences (initial) or specific steps with WP-xxx (detailed) |
{{owner}} | yes | agent / project-plan | name or role. Initial: PM by default. Detailed: specific team member |
5. Validation Checklist
Before presenting the result to the user — verify:
- All required placeholders replaced with values
- No
{{}}placeholders remaining in the text - Mode (initial/detailed) specified in the header
- Initial: ≥5 risks covering ≥3 categories from the reference table
- Detailed: all risks from v1 are present (updated or closed) + new risks from the plan
- Each risk: wording is "event → consequence", not just a topic
- Assessments are consistent: for EACH risk calculate the level using the table in §2 step 5 and COMPARE with the recorded value. Special attention: H×M=High (not Medium), M×H=High (not Medium)
- Strategy matches context (not "Accept" for a critical risk without justification)
- Detailed: each risk linked to WP-xxx, owner is a specific person
- Risk matrix is filled in, IDs match the table
- Matrix-table synchronization (element by element): for EACH risk write the triple: ID → probability from table → matrix row; ID → impact from table → matrix column. If row ≠ probability or column ≠ impact — CORRECT. Special attention: risks with L probability frequently end up in the "Medium" row
- All agent assumptions listed in the response
- Document status =
draft
6. Dependencies
Consumes (input):
project-charter.md← generate-charter (both modes)project-plan.md← generate-project-plan (detailed only)risk-register.mdv1 ← generate-risk-register initial (detailed only)
Produces (output): risk-register.md → consumed by:
generate-project-plan— for incorporating risks during planning (if initial)generate-closure-report— for final analysis (if detailed)
After the register is approved, the user must upload risk-register.md to the project knowledge base so it is available to dependent skills.
7. Usage Examples
Initial (phase 1)
User command:
Generate the risk register. Project charter is in knowledge.
Agent response (after generation):
Risk register generated (mode: initial) based on: project-charter.md.
Identified 7 risks (critical: 1, high: 2, medium: 3, low: 1). Categories covered: Technical, Resource, External, Organizational.
Assumptions:
- Project type inferred as "IT product launch" from the charter description.
- All risk owners set to PM (to be specified in detailed mode after the project plan is ready).
Action required: approve, provide comments, or reject.
[register content]
Detailed (phase 2)
User command:
Update the risk register. Project plan and current register are in knowledge.
Agent response (after generation):
Risk register updated (mode: detailed) based on: project-charter.md, project-plan.md, risk-register.md v1.
Risks in register: 11 (was 7). New: 4 (from WBS and resource plan analysis). Updated assessments: R003 escalated to "High" (external contractor dependency identified). All risks linked to work packages, owners assigned.
Assumptions:
- Owners assigned based on roles from project-plan.md.
Action required: approve, provide comments, or reject.
[register content]
Change Log
| Date | Version | Change |
|---|---|---|
| 2026-03-29 | 2.0 | Translated to English per translation-rules.md. Language Detection block and bilingual triggers added. Template references updated to -ru/-en suffixes |
| 2026-03-26 | 1.2 | Based on benchmark v1.1 results (96.1%, 3 failures — all D_logic): added explicit level calculation table (9 combinations) in §2 step 5 with emphasis on H×M=High; strengthened §2 step 7 (3-step matrix fill procedure with L-probability warning); strengthened §5 step 7 (row-by-row level verification) and §5 step 11 (element-by-element verification with triple extraction) |
| 2026-03-25 | 1.1 | Based on benchmark results (94.7%, 4 failures): strengthened §2 step 11 (mandatory next skill recommendation with exact phrasing), added matrix-table synchronization check in §5 and §2 step 7, fixed 10-column constraint in §3 with prohibition on adding columns |
| 2026-03-25 | 1.0 | Skill created |